简述: 总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。总包单元:上海森疑建立 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产物详情

上海紫竹国际大厦(原名浦东世纪花圃三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。筏板根蒂根基,主体为框架剪力墙构造。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单元:上海森疑建立
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司负担劳务施工,承包形式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程前后荣获上海市工程设计优秀奖、优良构造工程奖、安装“申安杯”优良工程、“白玉兰”杯及勤俭型工地等12种嘉奖。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中央和世纪公园,施工园地狭小,环保要求下。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 部分挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并取周边地铁站出入口相通,基坑监护要求下是本工程的一浩劫点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板薄1.5米,混凝土浇筑量远1万立方米,防备大体积混凝土底板发生温度裂痕是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位下,渡水部位多,防水工程庞大。地下室顶板设置了景观水池和广场集水坑,防渗漏要求下。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体构造工程,严厉历程掌握,钢筋接纳电脑排版,定尺进料,模板、混凝土平分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏向6mm,到达净水混凝土程度。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

产物具体

18 18 18 18 18

产品名称: 上海紫竹国际大厦

公布日期: 2019-01-23

点击数: 200

询价: 点击产物询价

二维码:

简述: 总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。总包单元:上海森疑建立 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产物详情

上海紫竹国际大厦(原名浦东世纪花圃三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。筏板根蒂根基,主体为框架剪力墙构造。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单元:上海森疑建立
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司负担劳务施工,承包形式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程前后荣获上海市工程设计优秀奖、优良构造工程奖、安装“申安杯”优良工程、“白玉兰”杯及勤俭型工地等12种嘉奖。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中央和世纪公园,施工园地狭小,环保要求下。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 部分挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并取周边地铁站出入口相通,基坑监护要求下是本工程的一浩劫点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板薄1.5米,混凝土浇筑量远1万立方米,防备大体积混凝土底板发生温度裂痕是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位下,渡水部位多,防水工程庞大。地下室顶板设置了景观水池和广场集水坑,防渗漏要求下。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体构造工程,严厉历程掌握,钢筋接纳电脑排版,定尺进料,模板、混凝土平分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏向6mm,到达净水混凝土程度。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

产物具体

18 18 18 18 2007cc太阳城集团

产品名称: 上海紫竹国际大厦

公布日期: 2019-01-23

点击数: 201

询价: 点击产物询价

二维码:

简述: 总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。总包单元:上海森疑建立 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产物详情

上海紫竹国际大厦(原名浦东世纪花圃三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,修建总高度99.8米。筏板根蒂根基,主体为框架剪力墙构造。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单元:上海森疑建立
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司负担劳务施工,承包形式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程前后荣获上海市工程设计优秀奖、优良构造工程奖、安装“申安杯”优良工程、“白玉兰”杯及勤俭型工地等12种嘉奖。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中央和世纪公园,施工园地狭小,环保要求下。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 部分挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并取周边地铁站出入口相通,基坑监护要求下是本工程的一浩劫点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板薄1.5米,混凝土浇筑量远1万立方米,防备大体积混凝土底板发生温度裂痕是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位下,渡水部位多,防水工程庞大。地下室顶板设置了景观水池和广场集水坑,防渗漏要求下。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体构造工程,严厉历程掌握,钢筋接纳电脑排版,定尺进料,模板、混凝土平分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏向6mm,到达净水混凝土程度。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

单页简介
江苏宏万里修建劳务有限公司
总公司办:南京市中山东路288号3006室
姑苏昆山办:姑苏昆山市衡山路799号19#2303室
总机:0512-36885556
传真:0512-36882869
邮箱:1966@jshwl.com.cn
网址:www.jshwl.com.cn
消息种别

CopyRight© 2019 江苏宏万里修建劳务有限公司    技术支持: